GeoPark completes Jauke 1 exploration well in Chile

GeoPark Ltd., Santiago, completed the Jauke 1 well on the Fell block in Chile. The operator drilled the well to 9,592 ft TD. A production test through different chokes in the Springhill formation resulted in an average production rate of 5.8 MMscfd of natural gas (970 boe/d) with a wellhead pressure of 2,738 psi.


Source: News